Contractor access control on a construction site
On a construction site, only the people on the day’s list get in, and that list is set by the main contractor, not the guard. Every subcontractor is declared through the main contractor, every new worker has had a safety induction before their first entry, every entry and exit is logged so that someone always knows who is on site right now, materials and plant leave only with written approval, tools are declared in a register, and out-of-hours access happens only on an approved request.
Updated: 7 min readSources: 3
Who decides which contractors get onto the site each day?
The main contractor or project manager, who sends the gate the next day’s list: companies, names and vehicles. The guard applies the list; they do not change it or make exceptions on their own.
A construction site has many employers working at once. Greece’s Labour Code requires that, when several businesses share a workplace, their employers cooperate and coordinate, with coordination falling on the employer who controls the site (article 533 §9). The access list is the simplest tool of that coordination: one party sets it, everyone knows it.
- Subcontractors through the main contractor: every subcontractor, and every sub-subcontractor, goes onto the list only via the main contractor — not because “the electrician brought him”.
- What it shows: company, names, trade, working days, vehicles, and one contact with a phone number per company.
- When it arrives: the day before, with a cut-off time; same-day changes in writing, from a named person.
- When someone finishes: they come off the list the same day and hand back their card and keys.
For why the list protects against theft, and for the site perimeter, see the guide to construction site theft. For cards, codes and access zones, see the access control guide.
Does a worker need a safety induction before entering a construction site?
Yes. The employer must train every worker in health and safety, among other times on hiring and on a change of duties, and must ensure that workers of external businesses have received appropriate instructions. The gate checks that the induction happened; it does not deliver it.
Greece’s Labour Code requires health and safety training for every worker, among other times on hiring and on transfer or change of duties (article 538 §1), and obliges the employer to ensure that workers of external businesses working on its premises have received appropriate instructions (article 538 §3). Only people who have received instructions may enter zones of serious and specific danger (article 533 §8δ).
- The content: set by the project’s safety team, based on the written risk assessment (article 534 §1) — not by the security company.
- The proof: a mark on the list, a card or a helmet sticker showing the worker was inducted, and when.
- At the gate: anyone without the proof does not go onto the site; they go to the safety lead or wait.
- Danger zones: if the project has restricted areas, the list says who is allowed there.
The guard is not the project’s safety technician. They check that the proof of induction exists; what the induction says is decided by the people responsible for safety at work.
Why log every entry and exit on a construction site?
So that someone always knows who is inside: during an evacuation, after an accident, and at the end of the day, when everyone should have left. Without logged exits, the headcount never adds up.
- Details: name, company, time in, time out, vehicle if any.
- Headcount: the number of people inside, available to the project manager during an evacuation.
- Closing the day: anyone who came in and did not sign out is checked before the site is locked — they may have left by another gate, or not.
- Accidents: the employer reports every work accident within 24 hours to the Labour Inspectorate and e-EFKA (article 534 §2). The gate record shows who was on site and when.
Paper or app, the rule is the same: one entry per arrival and one per departure. The details are personal data, so agree from the start who manages them and how long they are kept.
How do you control the materials and plant leaving a construction site?
With an exit pass signed by a named person on the project: what is leaving, how much, on which vehicle, to where. The guard compares the pass with what they see; anything not on the pass waits for the person in charge.
- The contractor asks the project manager for an exit and receives a pass with a description, quantity and vehicle.
- At the gate the guard compares the pass, the vehicle and the load.
- For plant — skid steers, generators, scaffolding, hired equipment — the serial number or plate is logged too.
- If something does not match, the vehicle waits and the person in charge is called; the decision is logged with a name and a time.
Deliveries arriving and how to log them are covered in the guide to construction site theft. Exits are the other half: a machine that left without a pass is far harder to trace than one that never came in.
What is a tools register, and why does a site need one?
It is the list of tools each contractor brings in and those the project lends out. Without it, nobody at the exit can say whether a hammer drill belongs to the crew or to the site.
- Their own tools: declared on first entry (type, make, serial or marking) and allowed out freely when they match the register.
- Project tools: signed out to a name with a time and signed back in with a time; anything not returned shows up when the day is closed.
- Marking: a colour or sticker per company turns the gate check into a matter of seconds.
- Disputes: the guard does not decide who owns a tool; they keep the record and call the person in charge.
How does out-of-hours access to a construction site work?
Only on a request approved in advance by a named person on the project, with names, a time window and the task. The guard confirms the approval before opening, and logs who came in, when they left and what they took.
- Planned work: an evening concrete pour, an early-morning delivery — approved in advance, with a list of names and vehicles.
- Emergencies: a leak, a pump failure, a fence down — the guard calls the project contact from the call list and logs who approved.
- No approval: the gate stays shut, even for someone the guard knows from the day shift. The person in charge is informed.
- Closing up: once they leave, the guard checks the site is as it was and that everyone who came in has gone.
Remote projects follow the same logic as solar parks, where maintenance crews enter on a scheduled approval. OVIT logs entries, exits and exceptions in the Guardly platform, so the project manager can see who came in overnight without having to ask (construction site security).
At a glance
- The main contractor sets the day’s list; the guard applies it and makes no exceptions alone.
- Every subcontractor goes onto the list only through the main contractor, and comes off it the day they finish.
- No proof of safety induction, no entry; the induction itself is set by the project’s safety team.
- Every person’s entry and exit is logged, so the headcount is right during an evacuation and when the day is closed.
- Materials, plant and tools leave only on a pass or against the register; out-of-hours access only on prior approval.
Frequently asked questions
Can the guard let in a worker who is not on the list?
Not on their own. They call the person the main contractor named for same-day changes; if that person approves in writing, the worker enters and the approval is logged with a name and a time.
Who gives new construction workers their safety induction?
The employer, with content based on the project’s written risk assessment (articles 534 and 538 of the Greek Labour Code). At the gate, the guard only checks that proof of the induction exists.
How does a contractor’s machine leave the site?
With an exit pass from a named person on the project, stating the machine, its serial number or plate, and the vehicle. The guard compares the pass with what they see and logs the exit.
Sources
Every legal or pay point in this guide was checked against the official sources below.
- Κώδικας Εργατικού Δικαίου (π.δ. 62/2025), άρθρο 533 §8δ και §9 — πρόσβαση σε ζώνες σοβαρού κινδύνου· συνεργασία και συντονισμός εργοδοτών στον ίδιο τόπο εργασίαςChecked
- Κώδικας Εργατικού Δικαίου (π.δ. 62/2025), άρθρο 534 §1 και §2 — γραπτή εκτίμηση κινδύνου· αναγγελία εργατικού ατυχήματος εντός 24 ωρώνChecked
- Κώδικας Εργατικού Δικαίου (π.δ. 62/2025), άρθρο 538 §1 και §3 — εκπαίδευση εργαζομένων· οδηγίες σε εργαζόμενους εξωτερικών επιχειρήσεωνChecked